Negotiable
The date of payment from buyers deliver within days
Guangdong
Long-term effective
2017-07-22 14:51
305
Company Profile
Nie-Tech Co., Ltd.By certification [File Integrity]
Contact:Miss Winnie Wen(Mr.)
Email:
Telephone:
Phone:
Area:Guangdong
Address:Guangdong
Website: http://nie-tech.jshongxingchem.com/
Technical data
Installation
1. Before installation ensure that the voltage supply is disconnected.
2. Connect switch module as shown on above diagram.
3. Connect the device in accordance with the wiring diagram presented in Wiring diagram. Switch on 120V of the mains voltage.
4. For "Add" in a network: Put the Z-wave interface controller into "Add" mode, and following its instruction to add the device to your controller. To get in the "Add" mode, the distance between wall-mounted switch and controller is suggested to be in one meter. Quickly pressing the learn switch of ZW30T/31T three times for 1 second at least & release to be included.
5. For "Remove" from a network: set up the Z-wave interface controller into "Remove" mode, and following its instruction to delete the ZW30T/31T from your controller. Press the learn switch of ZW30T/31T three times for 1 second at least &release to be excluded.
Maintenance
The devices are maintenance-free, so never open them. The guarantee becomes void when you open the appliance. Only clean the outside of the devices with a soft, dry cloth or a brush. Prior to cleaning, remove the devices from all voltage sources.
NOTE
Do not use any carboxylic cleaning agents or petrol, alcohol or similar. These will attack the surface of devices. Besides, the vapors are hazardous to your health and explosive. Do not use any sharp edged tools, screw drivers, metal brushes or similar for cleaning.
Warranty 1 year
Shipping &Packing
Company Information